2 server power control, Server power control – ADLINK IMB-S90 User Manual
Page 98

IMB-S90 IPMI User’s Manual
98
Quick Buttons
Explanation
Active Users
This quick button will work like toggle button if icon is in
green color server status is “power on” by clicking the
button “immediate shutdown” action will be triggered in
host If the icon is in red color server status is “power
off” . Click the button to “power on” the host.
This quick button displays the available hotkeys.
3.8.2 Server Power Control
This page allows you to view and control the power of your server.
To open Power Control and Status page, click Remote Control > Server Power Control
from the menu bar. A sample screenshot of Power Control and Status page is shown
below.
Power Control and Status Page
The various options of Power Control are given below.
Reset Server: This option will reboot the system without powering off (warm boot).
Power Off Server – Immediate: This option will immediately power off the server.
Power Off Server – Orderly Shutdown: This option will initiate operating system
shutdown prior to the shutdown.
Power On Server: This option will power on the server.