Installation and assembly, Bc a – MCZ Vivo 90 Pellet Comfort Air User Manual

Page 22

Advertising
background image

B

C

A

A

20

7-INSTALLATION AND ASSEMBLY

SMOKE EXHAUST CONNECTION

COMBUSTION AIR

During operation a certain amount of air is drawn from the room in which the product is installed and this air must be supplemented

through an external air inlet.

In this product the input of combustion air is directly from the grille, placed on the pellet loading hatch, in an autonomous manner. It is

necessary to connect the pipe diam. 65 mm the product is equipped with and the hatch as shown in the figure.

The user may decide to draw combustion air from the outside, in which case the pipe must be connected to the product and to an external

air inlet.

A - AIR INLET FROM PELLET LOADING

HATCH

B - FLEXIBLE HOSE

C - PIPE CONNECTION TO THE PRODUCT

Advertising