Hisense HAIO163 163" Full HD HDR All-in-One LED Commercial Display User Manual
Page 34
29
M6×22 *total 69 PCs, for cabinet with cabinet
(5)Lock the screws between No.15 and No.16 cabinets and the connecting blocks in sequence, and
then respectively lock the screws between the two cabinets and the bottom beam;
(6)Fix No. 14, No. 17, No. 13 and No.18 cabinet in sequence according to the above method.
Note:
If there is no rear connecting block behind the corresponding position of cabinets, then no need to
fix the screws.
(7)Check the flatness of the cabinet, need to check all the positions (front, rear, left and right) of the
cabinet and the bottom beam.
(8)Fix the cabinets in the second and third rows in the order of middle outward and upward.
Note:
The lower surface of the second row of cabinets is connected with the upper surface of the first row
of cabinets, and the lower surface of the third row of cabinets is connected with the upper surface
of the second row of cabinets. Fix with M6×22 screws and check the flatness of cabinet, and the
segment difference between the left side and the right side of each row shall be kept uniform.
M6Ч22Ч3 PC
LED All-In-One User Manual
(4) Use the same method to fix No. 16 cabinet (or No. 15 cabinet). Then use three special silver M6 x 22mm
set screws shown in the Figure to attach cabinets to cabinets from bottom center outward. Hand
tighten. Use 6mm hex wrench to fix the sides of the two cabinets, adjust the front surface of the cabinet
and the flatness of the upper side, and then tighten the screws. You can also pre-connect the sides of
No. 15 and No. 16 cabinet to form a set of cabinets, and then fix to the bottom beam on the whole.