Components to be replaced required work steps – Lukas Concrete crushers User Manual

Page 31

Advertising
background image

31

10.3 Repairs

10.3.1 Repairs to the unit

(without replacement of guard, hose or coupling )

NOTE:

The crusher arm bolts are only accessible when the crusher arms are almost

touching!

3. Remove the split pin “A”

A

A

Procedure:

1. First of all, carefully clean the rescue equipment.

2. Next, close the blade arms so that the tips are almost touching.

Components to be

replaced

Required work

steps

Guard

1. - 5. and 14.

Handle

1. - 6. and 14.

Pivot bolt

1., 2., 8. and 14.

Crusher arms

1. - 10. and 14.

Tips

1., 11. and 14.

Protective sleeve

1. - 10. and 12. - 14.

Advertising