Wiring, Danger, Caution – Viking Pump TSM750: M10 Power Load Monitor User Manual

Page 3

Advertising
background image

This wiring example shows how the Power Load Monitor

can be used to control the starting and stopping circuit of

the motor. Other wiring configurations are possible.

The current transformer must be placed in the same

phase that is connected to terminal 9, phase L1.

For single phase connection refer to Figure 2 for the

alternate single phase connection. To complete the

remaining wiring refer to Figure 1.

LATCHED OR UN - LATCHED ALARM

DANGER !

The monitor must be installed by qualified personal.

• Always disconnect, lockout, and tag out supply

circuits prior to installing.

• The installation must comply with standard and

local regulations.

• Study this manual thoroughly before installing and

using the Power Load Monitor.

• Pay special attention to this section and the parts

marked “CAUTION!” or “DANGER”.

• Should questions or uncertainties arise, please

contact your authorized Viking distributor.

Note!

Removing or breaking the seal on the housing will

invalidate the warranty.

CAUTION !

If the START/ STOP is connected according to figure

1, it is recommended that terminals 6 and 7 be by-

passed during settings. After the settings are

completed the by-pass must be taken out.

WIRING

Un-Latched (Auto Reset) when voltage supplied to

terminal 5 and 6. Latched Alarm when terminal 5 and

6 opened (not connected).

SECTION TSM 750

ISSUE A

PAGE 2 OF 7

VIKING PUMP, INC. ● A Unit of IDEX Corporation ●

Cedar Falls, IA 50613 USA ©2002

FIGURE 2

Single-Phase Wiring Example

FIGURE 3.

Wiring Example For Latched Or Un-Latched Alarm

FIGURE 1

Standard Wiring Three-Phase Motors

SECTION TSM 750

ISSUE

B

PAGE 3 OF 8

Advertising