Dialogic SS7G21 User Manual

Page 91

Advertising
background image

91

SS7AM1 Programmer’s Manual Issue 7

for SS7 serial interface ports 38

SS7 serial interface port

location of 36

see also "V.11 (V.35-compatible) ports"

specifications 16

splitter cable 38

SS7 signaling boards

capabilities of 12, 31

installing or replacing 64

location of in chassis 62, 65

part numbers 80

SPCI boards

preparing for installation 62

SS7HDP boards

preparing for installation 63

SS7G20SHDD

backing up the system configuration 56

replacing 55

replacing the hardware 56

restoring the system configuration 57

SS7G21

Declaration of Conformity 23

location of major components 61

physical specifications 19

product overview 11

reliability calculations 19

SS7G22

Declaration of Conformity 24

location of major components 61

physical specifications 19

product overview 11

reliability calculations 19

SS7HDP boards

installing or replacing 64

preparing to install 63

switches

power switch 17

reset switch 17

unit identification switch 18

T

telecommunications compliance

installation actions 26, 28

specifications 22, 27

temperature range 19

TNV-1 7, 29, 87

tools and equipment 47
top cover

removal of 59, 60

V

V.11 (V.35-compatible) ports

cabling for 83

clocking 85

configuration 85

connecting to 28, 83

connector pinouts 37

specifications 16

ventilation 10, 13

W

Warnings

class A 28

for service personnel 43

for users 7

international 69–78

when working inside the product 59

Advertising
This manual is related to the following products: