4 processor unit – Furuno FSV-84 User Manual
Page 36
Advertising
2-8
2.4 Processor
Unit
Cables from the monitor unit, transceiver unit and other equipment are connected to the
CONE Board (10P6905) in the processor unit.
Cable tie
15 cm
Group cables according to left side
and right side connection point and
bind each group with cable tie, 15 cm
from connector. Confirm that no stress
is placed on any cable when it is
plugged in.
Processor unit, right side view Processor unit, rear view
CN-A104
CN-A103
CN-A102
CN-A101
Processor unit
Advertising