HP Hitachi Dynamic Link Manager Software User Manual

Page 229

Advertising
background image

4. HDLM Operation

207

HBA to the LUN security.

6.

Execute the following command:


# diag

Note

For details on the operations after executing the

diag

command, see the AIX

documentation. Steps 7 to 14 below provide an example of the execution

procedure for AIX V6.1 (Technology Level 02).

7.

From the displayed menu, choose Task Selection.
The Task Selection List window appears.

8.

Choose Hot Plug Task.
The Hot Plug Task window appears.

9.

Choose PCI Hot Plug Manager.
The PCI Hot Plug Manager window appears.

10. Select List PCI Hot Plug Slots to check the PCI slot to be replaced:

The shading indicates the PCI slot where the HBA is to be replaced.

11. Go back to the PCI Hot Plug Manager window, select Unconfigure a Device, and

enter in Device name the device that is to be replaced.
For the Unconfigure any Child Devices and KEEP definition in database

items, select yes.

Advertising