Muxlab LongReach II Active CCTV Receiver Hub User Manual

Page 16

Advertising
background image

© MuxLab.

LongReach II Active CCTV Receiver Hub Installation Guide

Page 16

12. The following diagram illustrates a typical

configuration.

13. The LongReach II Hub is equipped with resettable

fuses to protect the circuitry. In the event of a power
surge, the fuse(s) will trip and the green LED will
dim. In order for the fuse(s) to reset, the power to the
LongReach II Hub must be turned OFF for 2-3
minutes. The fuse(s) will then reset and the power
can be turned on again.

Advertising