Pre-wall installation of the cb-tp17 conduit box – AMX Modero NXD/NXT-1200VG User Manual

Page 81

Advertising
background image

Installation Procedures: 17" Panels

67

VG-Series Modero Touch Panels

Refer to your particular VESA mount manufacturer’s installation procedures for further surface mounting
procedures.

Pre-wall Installation of the CB-TP17 Conduit Box

Wall Mount panels (NXDs) are contained within a metallic outer housing (back box). This back box is not
removed
when installing the NXD into a Conduit Box (CB-TP17). The back box is only removed to gain
access for the replacement of the Compact Flash component or upgrade to the VESA housing.

The CB-TP17 Conduit/wallbox is an optional metallic box that is secured onto a beam in a pre-wall setting
(where no walls or present). Installation procedures and configurations can vary. This section describes the
installation procedures for the most common installation scenario.

The most important thing to remember when mounting this conduit box is that the mounting tabs must be
mounted flush against the outside of the sheetrock. This step determines whether or not the mounting stud is
notched (cutout-out to fit the conduit box).

1.

Measure the distance between the inside of the two selected stud beams. Most beams have a distance of
about 14" to 16". This is too narrow to accommodate the 17.072" (43.36 cm) wide CB-TP17 conduit box.

2.

Determine whether one or both of the selected stud beams must be notched (FIG. 55). The determining
factor is the flush alignment of the mounting tabs along the outside of the post-wall sheetrock.

3.

Cutout the notched beam using a height of 13.554" (34.43 cm) (as shown below in FIG. 55) and a depth
equal to the thickness of the drywall.

FIG. 54

Installation of grommet into the rear plastic enclosure

Rear plastic cover (rear view)

Rim of the strain relief grommet
should lie flush against enclosure

CLIP FACING UP

VESA mount connection location
(USE ONLY AMX PROVIDED #8-32 screws)

INSTALLER: LEAVE A GAP BETWEEN THE STUD AND CONDUIT BOX TO
ACCOMMODATE THE DRYWALL/SHEETROCK.

This gap allows the installation of

the drywall/sheetrock after the CB-TP17 has been mounted onto the beams.

The stud notching and conduit box installation must be done prior to any wall
installation.