Metrohm NIRS XDS Process Analyzer – DirectLight/NonContact User Manual
Page 35
▪▪▪▪▪▪▪
33
Lifting Instructions:
Always use a sturdy wheeled cart when transporting
the instrument. It may be laid on its back for stability,
then lifted upright prior to actual mounting.
The unit may be lifted by two workers and guided
into place by a third. One worker should be
positioned on each side of the unit, and should hold
the cabinet, not any accessories. Alternatively, a wide
platform may be placed under the instrument, and
the platform may be lifted.
If using a lift truck or other mechanized equipment,
avoid damage to the cabinet or installed parts. Always
stabilize the enclosure, so it cannot fall and sustain
damage, or injure a worker.
Always wear safety glasses, safety shoes and other
protective equipment as required.
3.
Leave adequate mounting space for all installed options, as well as room for air circulation
and wiring access. Recommended minimum access and mounting space is as follows:
SYSTEM
Left Side
Right Side
Top
Bottom
Front Access
Basic Unit,
Fan-cooled
12” (305mm)
18” (457mm)
18” (457mm)
Flush Mount 48” (1220mm)
Vortec
Cooled
12” (305mm)
18” (457mm)
18” (457mm)
Flush Mount 48” (1220mm)
Purged
System,
Vortec Cooled
12” (305mm)
18” (457mm)
18” (457mm)
Flush Mount 48” (1220mm)
Purged
System, Air
Conditioned
12” (305mm)
18” (457mm)
18” (457mm)
Flush Mount 48” (1220mm)
4.
Mounting dimensions for the enclosure feet are as shown on the following page.
The mounting bolts must be 3/8” (10mm) in size. The environment may require stainless steel
due to industry or washdown requirements.
5.
Lift the instrument onto the mounting bolts, seating both upper mounting brackets first.