2 authorized officiator, 3 execution, 2 system – K-Patents PR-23 for K-Patents Appendix User Manual

Page 34: 1 qualifying the system, 2 manufacturers and suppliers, 2 authorized officiator 6.1.3 execution

Advertising
background image

Document/Revision No. IM-GB-PR23-VACCINES: Rev. 1.01 Effective: November 1, 2013

34

Appendix to the Instructions Manual PR-23

6.1.2 Authorized officiator

Selection of the individual authorized to carry out the Installation Qualification of the Pharma
Refractometer system should be in accordance to their relevant ability to undertake the
procedure. The authorized officiator’s signature is required for the next stage to validate
Date/Initials in the Installation Qualification log and reports.

Name:

Function:

Date:

Signature:

Initials:

6.1.3 Execution

As it is executed, each described step of the Installation Qualification requires initialing
and dating. If any deviations occur, the qualification must either be aborted or a detailed
explanation of the deviations must be entered in the subsequent “Deviation, evaluation,
corrective actions” logs and must be documented appropriately.

6.2 System

6.2.1 Qualifying the system

Location of the Pharma Refractometer Sensor and Pharma Mini flow cell:

Location of the Indicating Transmitter:

Device

Serial Number

Supplier

Manufacturer

Pharma Refractometer:

Sensor PR-23-AC-62-HSS

K-Patents Oy

Pharma Refractometer: Indicating

transmitter DTR-M/U-GP-SC

K-Patents Oy

Computer

Advertising