Sidewall direct venting, Vent/air termination – sidewall, Installation & operation manual – Lochinvar Knight 80 - 285 User Manual

Page 18

Advertising
background image

Installation & Operation Manual

18

5.

Maintain clearances as shown in FIG.’s 4-1A thru 4-3B,
pages 17 and 18. Also maintain the following:
a.

Vent must terminate:
• At least 6 feet from adjacent walls.
• No closer than 12 inches below roof overhang.
• At least 7 feet above any public walkway.
• At least 3 feet above any forced air intake within

10 feet.

• No closer than 12 inches below or horizontally

from any door or window or any other gravity air
inlet.

b.

Air inlet must terminate at least 12 inches above
grade or snow line; at least 12 inches below the vent
termination; and the vent pipe must not extend
more than 24 inches vertically outside the building
as shown in FIG. 4-1B.

c.

Do not terminate closer than 4 feet horizontally
from any electric meter, gas meter, regulator, relief
valve, or other equipment. Never terminate above or
below any of these within 4 feet horizontally.

6.

Locate terminations so they are not likely to be damaged by
foreign objects, such as stones or balls, or subject to buildup
of leaves or sediment.

Vent/air termination – sidewall

4

Sidewall direct venting

ALTERNATE VENTING ARRANGEMENT

(IF SPACE PERMITS)

BIRD

SCREEN

12”

MIN

12” MIN

15” MAX

COUPLING

TO BOILER
INTAKE AIR

CONNECTION

FROM BOILER

VENT PIPE

CONNECTION

BIRD SCREEN

Figure 4-1C Alternate Venting Arrangement (if Space
Allows) w/Field Supplied Fittings

VENT / AIR

TERMINATION

12"

MIN.

12"

MIN.

12"

MIN.

Figure 4-2A Clearance to Gravity Air Inlets

Figure 4-2B Alternate Clearance to Gravity Air Inlets
w/Field Supplied Fittings

FORCED AIR

INLET

VENT / AIR

TERMINATION

7' MIN. ABOVE ANY

PUBLIC WALKWAY

IF LESS

THAN 10’

36"

MIN.

Figure 4-3A Clearance to Forced Air Inlets

Figure 4-3B Alternate Clearance to Forced Air Inlets
w/Field Supplied Fittings

Advertising