Determine boiler location – Lochinvar Knight 80 - 285 User Manual

Page 9

Advertising
background image

Installation & Operation Manual

9

1

Determine boiler location

(continued)

RECOMMENDED SERVICE CLEARANCES:

FRONT - 24”
TOP - 24”
LEFT SIDE - 24”
REAR - 24”

Figure 1-2 Alcove Installation - Minimum Required Clearances

RECOMMENDED SERVICE CLEARANCES:

FRONT - 24”
TOP - 24”
LEFT SIDE - 24”
REAR - 24”

Figure 1-1 Closet Installation - Minimum Required Clearances

ƽ WARNING

For closet installations, CPVC
material MUST BE used in a closet
structure due to elevated
temperatures. Failure to follow this
warning could result in fire,
personal injury, or death.

ƽ WARNING

For alcove installations, CPVC
material MUST BE used in an
alcove structure due to elevated
temperatures. Failure to follow this
warning could result in fire,
personal injury, or death.

Advertising