Installation, Installation into a masonry fireplace – Lopi Masonry Fireplace Factory Built (Metal) Fireplace Mobile Home Model: Pioneer Bay (Heritage Bay PI) User Manual

Page 14

Advertising
background image

1 2

Installation

Travis Industries

4 0 5 1 2 1 6

9 3 5 0 8 0 5 1

Installation into a Masonry Fireplace

“L” Vent Flex

Section

Outside air may be drawn

from the ash cleanout.

6” Min.

“L” Vent

Storm Collar

Vertical Cap

Cover Plate (non-combustible)

Silicone

Seal the cover

plate with silicone.

3/8” Gap is required

between the surround

panels and the front of

the fireplace.

13” Min.

HINT:

Paint the interior of the

fireplace with latex paint to

prevent fireplace odors

from entering the home.

Advertising