Setting up the measurement environment, Setting up the measurement environment -24 – Agilent Technologies Agilent E5250A User Manual

Page 280

Advertising
background image

9-24

Agilent E5250A User’s Guide, Edition 11

Executing Sample Programs
HCI Measurement Program

Setting up the Measurement Environment

Before executing the program, you need to set up the measurement environment as
follows:

1. Prepare the equipment shown in Table 9-6, which lists the required equipment to

execute the program.

2. For each E5255A, make internal connections, and set the DIP switches. Refer to

Figure 9-3.

Three E5255As are used, which are installed in Slot1, Slot2, and Slot3 of the
E5250A. The internal connections of the three E5255As are almost the same,
except for the following:

IVin1 internal connection (1 in Figure 9-3) for each E5255A:

for Slot1: IVin1 to SMU1

for Slot2: IVin1 to SMU3

for Slot3: IVin1 to SMU4

DIP SW settings in each slot are different as shown in Figure 9-3. But within
each E5255A, SW1/SW2/SW3 settings are the same.

3. Connect all equipment and devices as shown in Figure 9-4 and Table 9-7. Refer

to Chapter 4 for the details of the connection from the E5250A output to Device
Under Test (DUT).

Advertising