Japan-specific requirements, Table 3, Power and cooling requirements – r1200 – ClearCube R Series Pentium 4 User Manual

Page 46: Table 4, Power and cooling requirements – r2100

Advertising
background image

36 • Network Planning and Site Preparation

ClearCube Product Manual and Installation Guide

Japan-Specific Requirements

Model R1200 Blades equipped with 3.4 GHz or greater processors must be installed

into Cages containing rev. H1 or greater BackPacks. BackPacks that are not rev. H1

or greater are rated at only 10 amps, which is insufficient to power eight fully loaded

3.4 GHz processors on a 100 VAC power system. The additional load could blow the

fuse in the BackPack. If you have an existing 10 amp-rated BackPack and have a

requirement to run 3.4 GHz processors on a 100 VAC system, please contact

ClearCube support for assistance.

Table 3 Power and Cooling Requirements – R1200

Units Per Rack

Power Requirements

Typical Current Draw

Thermal

Cages Max No.

Blades

Rack

Space (U)

Peak Power

(kVA)

Peak Current

at 120V (A)

Low Current

at 120V (A)

High Current

at 120V (A)

Generated Heat

Load (Btu/hr.)

Required Cooling

Capacity (tons)

1

8

3

1.2

12

4.5

9

3,685

0.31

2

16

6

2.4

24

9

18

7,370

0.62

3

24

9

3.6

36

13.5

27

11,055

0.93

4

32

12

4.8

48

18

36

14,740

1.24

5

40

15

6

60

22.5

45

18,425

1.55

6

48

18

7.2

72

27

54

22,110

1.86

7

56

21

8.4

84

31.5

63

25,795

2.17

8

64

24

9.6

96

36

72

29,480

2.48

9

72

27

10.8

108

40.5

81

33,165

2.79

10

80

30

12

120

45

90

36,850

3.1

11

88

33

13.2

132

49.5

99

40,535

3.41

12

96

36

14.4

144

54

108

44,220

3.72

13

104

39

15.6

156

58.5

117

47,905

4.03

14

112

42

16.8

168

63

126

51,590

4.34

Table 4 Power and Cooling Requirements – R2100

Units Per Rack

Power Requirements

Typical Current Draw

Thermal

Cages Max No.

Blades *

Rack

Space (U)

Peak Power

(kVA)

Peak Current

at 120V (A)

Low Current

at 120V (A)

High Current

at 120V (A)

Generated Heat

Load (Btu/hr.)

Required Cooling

Capacity (tons)

1

4

3

1.2

10

4.2

8.1

3,315

0.28

2

8

6

2.4

20

8.4

16.2

6,630

0.56

3

12

9

3.6

30

12.6

24.3

9,945

0.84

4

16

12

4.8

40

16.8

32.4

13,260

1.12

5

20

15

6

50

21

40.5

16,575

1.4

6

24

18

7.2

60

25.2

48.6

19,890

1.68

7

28

21

8.4

70

29.4

56.7

23,205

1.96

8

32

24

9.6

80

33.6

64.8

26,520

2.24

9

36

27

10.8

90

37.8

72.9

29,835

2.52

10

40

30

12

100

42

81

33,150

2.8

11

44

33

13.2

110

46.2

89.1

36,465

3.08

12

48

36

14.4

120

50.4

97.2

39,780

3.36

13

52

39

15.6

130

54.6

105.3

43,095

3.64

14

56

42

16.8

140

58.8

113.4

46,410

3.92

* R2100 Blades are double-width, and fit four per Cage.