Top mounting brackets – Hired-Hand Unitized Mega Cool: Square Bottom User Manual
Page 21
Part No. 4801-5396 Rev. 5-08
Unitized System - Square Reservoir
Page 21 of 63
Top Mounting Brackets
1.
Install the top mounting brackets for curtain installation. Mount the center of
the first bracket on center of the first 4 x 4 post. Vertically position each
bracket distance 3-1/4” from the 2" x 6" filler as shown above (Refer to the
Installation Overview for the framing you are installing, page 7).
2.
The Top mounting brackets should be spaced by the horizontal distance given
in table at the left depending upon which system you are installing.
3.
Secure the top mounting brackets to the wall board with 1/4" x 1-1/2" Lag
screws.
Horizontal Spacing
For Top Mounting Brackets
Back Plate
Spacing
5’ 5’
8’ 4’
10’ 5’
12’ 6’
3-1/4"
Insert 1/4”x1-1/2”
Lag Screw
through holes in
flange of bracket.
Make sure 2”x6”
filler is at proper
height.
(See Tables on
page 7)
Top Mounting Bracket
.
Side View
Center of
Bracket in
line with
Center of
Post
Front View