Unitized System - Square Reservoir

Page 21 of 63












































Top Mounting Brackets

1.

Install the top mounting brackets for curtain installation. Mount the center of
the first bracket on center of the first 4 x 4 post. Vertically position each
bracket distance 3-1/4” from the 2" x 6" filler as shown above (Refer to the
Installation Overview for the framing you are installing, page 7).


2.

The Top mounting brackets should be spaced by the horizontal distance given
in table at the left depending upon which system you are installing.

3.

Secure the top mounting brackets to the wall board with 1/4" x 1-1/2" Lag
screws.

Horizontal Spacing

For Top Mounting Brackets

Back Plate

Spacing

5’ 5’

8’ 4’

10’ 5’

12’ 6’

3-1/4"

Insert 1/4”x1-1/2”

Lag Screw

through holes in

flange of bracket.

Make sure 2”x6”

filler is at proper

height.

(See Tables on

page 7)

Top Mounting Bracket

.

Side View

Center of

Bracket in

line with

Center of

Post

Front View