Editing scheduled jobs – HP StoreEver ESL G3 Tape Libraries User Manual

Page 60

Advertising
background image

5.

Click the Recipients tab, and then add one or more e-mail recipients to the job.

To add a recipient, type an e-mail address in the box, and then click Add. (You can add
more than one recipient to a job.)

If you need to remove a recipient from a job, click the recipient, and then click Remove.

6.

Click OK.

The new job appears in the list of scheduled jobs. The LMC will generate the report at the
specified time and send it to the designated e-mail recipients.

NOTE:

If a yellow caution icon appears next to a scheduled job on the Reporting Options

dialog box, it means there is a problem with the job. For example, the date for the job might
be in the past. To correct the problem, edit the job to change job options. For more information
about editing scheduled jobs, see

“Editing scheduled jobs” (page 60)

.

7.

Click Close to close the Reporting Options dialog box.

Editing scheduled jobs

If you need to make changes to a scheduled job, edit it to change job options. You can change
any job options, such as the date, time, report template, or e-mail recipients.
To edit scheduled jobs:

60

Modifying the library configuration

Advertising