Power track hoses -5 – JLG E300 Service Manual User Manual

Page 103

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121253

– JLG Lift –

4-5

8. Connect all the hose/line couplings on the side of

the boom as tagged during removal. Install the
clamp blocks securing the hoses/lines. Refer to Fig-
ure 4-4., Clamp Block Installation.

9. Install the cable cover onto the side of the main

boom.

10. Connect the hydraulic lines running to the level cyl-

inder as tagged during removal.

11. Align the jib and platform assembly with the attach

points on the boom.

12. Using JLG P/N 0100011 thread locking compound

or equivalent, install the retaining bolt, keeper, and
pin that secures the main boom to the jib. Torque the
retaining bolt to 85 ft.lbs. (116 Nm).

LEVEL (MASTER) EXTEND HOSE

LEVEL (MASTER) RETRACT HOSE

POSITION BOTH LEVEL CYL
HOSES TO THE OUTSIDE OF
PUSH TUBE AS SHOWN

A/C CABLE ROUTED ON TOP OF JIB CYL HOSES

JIB CYL RETRACT HOSE

JIB CYL EXTEND HOSE

LOWER BOOM CONTROL HARNESS

PLATFORM RETURN HOSE

PLATFORM SUPPLY HOSE

WELD LEAD OR AIR LINE

Figure 4-3. Power Track Hoses

Advertising