Header operation - a series – MacDon M150 SP User Manual

Page 104

Advertising
background image

HEADER OPERATION - A SERIES

Form 169017 / 169087 / 169095

102

Revision C

d. Connect center-link as follows:

MECHANICAL LINK - M150

1. Loosen nut (F), and rotate barrel (G), to adjust

length so that other end lines up with header
bracket.

2. Install pin (H), and secure with cotter pins.

3. Adjust link to required length for proper

header angle by rotating barrel (G). Tighten
nut (F) against barrel. A slight tap with a
hammer is sufficient.

4. Proceed to step e.


HYDRAULIC LINK WITHOUT SELF-ALIGNMENT
KIT - M200 STD, M150 OPTION

1. Relocate the pin at the frame linkage as

required to position the hook over the header
pin.

2. Activate HEADER TILT cylinder switches on

GSL to extend or retract center-link cylinder
so that the hook lines up with the header
attachment pin.

3. Push down on rod end of link cylinder until

hook engages pin on header and is locked.

4. Check that center-link is locked onto header

by pulling upward on rod end of cylinder.


HYDRAULIC LINK WITH OPTIONAL SELF-
ALIGNMENT KIT

1. Adjust the position of the center-link cylinder

with the REEL UP and REEL DOWN
switches, and HEADER TILT switches on the
GSL to position the hook above the header
attachment pin.

2. Lower the center-link onto the header with

REEL DOWN switch, until it locks into position
(handle is down).

(continued next page)

G

F

H

HEADER TILT UP

HEADER

TILT DOWN

REEL UP

REEL DOWN

Advertising
This manual is related to the following products: