Chapter 3 Operation

Normal Start-up and Operation

I

t is important to verify that the control console is

programmed correctly before beginning operations
each day. Refer to Chapter 2 to review the proce-

dures for entering this information.

A. CONSTANTS: Verify that the proper Distance, Flow/

Rate Sensor, and Boom/Spread Width constants are
still entered in the console. It is a good idea to write
these constants down in a convenient location like
the space provided on last page of this manual.

B. APPLICATION RATES: Verify the application rate

settings (Standard Rate & Alternate Rate).

C. ACCUMULATED AREA: If desired, the two acre

accumulators can be reset to zero independently to
allow the tracking of two separate areas.

D. ACCUMULATED VOLUME: Accumulated volume

can be reset to zero. Product Vol. (the count down
register) can be set for the load aboard.

E. The control system is now ready to begin automated

application. Set the Mode Selector switch to the
OPERATE position. Select an appropriate display,
such as Scan.

F. Start the vehicle engine and make sure the pumps

and/or hydraulics are engaged.

G. As you reach the starting point of the first swath, turn

ON the desired Boom switches, and the Master
switch. The TASC 6100 controls application. The
function selected on the Display Selector begins to
register.

H. When you reach the end of the swath, turn OFF the

Boom switches, or Master switch to temporarily stop
application. When the vehicle has been turned and is
ready to start applying on the next swath, turn the
Booms back ON and controlled application resumes.