6 lubricating joint 3 ball screw/spline, Required grease for the robot, Lubrication procedure – Adept i600 Cobra User Manual

Page 63: Section 5.6

Advertising
background image

Lubricating Joint 3 Ball Screw/Spline

Adept Cobra i600/i800 Robot User’s Guide, Rev G

63

Contact Adept if you find any signs of oil in these areas.

5.6

Lubricating Joint 3 Ball Screw/Spline

Required Grease for the Robot

Lubrication Procedure

1. Turn off main power to the robot.

2. Remove the outer link cover by removing six screws located on the sides and top

of the cover. Carefully remove the cover.

3. Switch on 24 VDC power to the robot

4. Press the Brake Release button and move Joint 3 to the top of its travel. Remove

any existing grease with a soft, clean, lint-free cloth.

5. Using a syringe, apply a small bead of grease to the Joint 3 ball screw grooves (see

Figure 5-1 on page 64

).

6. Move Joint 3 to the bottom of its travel. Remove any existing grease with a soft,

clean, lint-free cloth.

7. Apply a thin film of grease to any grooves of the ball screw that you did not reach

in

Step 5

.

8. Move Joint 3 up and down several times to spread the grease evenly.

Ball Screw/Spline Assembly Grease

LG-2 Lubricating Grease
Lithium Soap, Synthetic Hydrocarbon

Adept part number: 85139-00002

CAUTION:

Using improper lubrication products on the

Adept Cobra i600 or i800 robot may cause damage to the
robot.

WARNING:

When the outer link cover is removed, you see

the label shown in

Figure 6-4 on page 74

. Do not remove

the J3-ENC or J4-ENC encoder cable connectors from their
sockets. If they are removed, the calibration data will be
lost and the robot must be run through a factory
recalibration process, which requires special software and
tools.

Advertising
This manual is related to the following products: