Installation (cont.), Mounting cm25 to roof structure (cont.) – MovinCool CM25 User Manual

Page 12

Advertising
background image

12

INSTALLATION (cont.)

Mounting CM25 to Roof Structure (cont.)

Example of Mounting with Pallet

1. Install four (4) suspension rods by suspending them from suitable building

structure members. Locate the rods so that they will align with four mounting

holes that are part of the unit base. Make sure to securely anchor the top ends

of the suspension rods and tighten all nuts.

2. Insert four (4) nuts (top) to the suspension rods before mounting the unit (12.0

inch minimum height from the bottom end of the suspension rods).

3. Locate the rods so that they will align with four mounting holes. Enter the lifts

into pallet openings. Slowly lift up the unit with the pallet.

12.0 in

Min.

29.8 in

51.3 in

THREADED
SUSPENSION ROD

ROOF STRUCTURE

NUT (top)

LIFTS

UNIT

PALLET

SUSPENSION ROD

MOUNTING HOLE

Advertising