2preoperation check, 2 preoperation check – Parker Hannifin Dynaserv G2 User Manual

Page 38

Advertising
background image

4-3

4.2

Preoperation check

(1) Items to prepare

Motor unit/driver/sensor/DC power supply

PC utility (floppy disk)

Level block for fixing the motor

PC (with Windows 95/98/98SE/Me/NT4.0/2000 installed)

Various cables

(2) Installation and Wiring

Motor part

(main body)

DrvGII

type

driver

Sensor

PC

(prepared by customers)

1) Level block
(prepared by customers)

4) Motor cable
CM0300M(R) -ooo

7) RS232C cable
(dedicated)
CP7576(77)S-020

3) Power supply line

Level block

CN 2

TB 1

TB 2

24V DC

power supply

(prepared by customers)

6) Sensor wiring
(prepared bycustomers)

5) Encoder cable
CE7800M(R)-ooo

PC utility (software)

CN 1

Positioning

controller

CN 4

(3) Items to be checked

Check

1)

Is the main body fixed on the level block?

"

2)

Is the motor not interfering with peripherals?

"

3)

Is the power supply line wired properly? (LINE, GND)

"

4)

Is the motor cable wired properly? (VA, VB, VC. GND)

"

5)

Is the encoder cable wired properly?

"

6) Is the sensor wired properly?

"

(Home position, OT sensor: driver (or positioning controller))

7)

Is the RS232C cable wired properly?

"

8)

Is RS-232C operation enabled?

"

(Is bit 2 of PSW1 is on?)

9)

Is the wiring with the positioning controller done properly?

"

(See a connection example on the following page.)

4

Advertising