9.10.9 Set-Up Open Analysis Points

The following procedure allows the user to set the analysis points to calculate velocity of the circuit
breaker in the open operation. The open analysis point #1 is 1.00 inch from the fully closed
position of the circuit breaker. The open analysis point #2 is 2.00 inches from the fully closed
position.

Table 15.0 Setting Up "OPEN" Analysis Points Using Distance

STEP OPERATION

ACTION

DISPLAY

1

SELECT SET UP MENU.

PRESS # 3 KEY.

1.ANALYSIS POINT

2.MEASUREMENT UNITS

3.SAVE / RESTORE

4.NEXT PAGE

2

SELECT ANALYSIS POINT.

PRESS # 1 KEY.

1.OPEN TIMING

2.CLOSE TIMING

3.PRINT SETTING

4.TEST PLAN

3

SELECT OPEN TIMING.

PRESS # 1 KEY.

OPEN ANALYSIS PT 1

1.PERCENT OF STROKE

2.DISTANCE FROM CLOSE

3.CONTACT #1

4

SELECT DISTANCE FROM CLOSE.

PRESS # 2 KEY.

OPEN ANALYSIS PT 1

DISTANCE FROM CLOSE

VALUE: XX.XX in

"ENTER" TO CONFIRM

5

ENTER 1 INCH.

PRESS KEYS 0-9 TO

SET 1.00. USE THE

“ENTER” KEY TO

CONFIRM.

OPEN ANALYSIS PT 1

DISTANCE FROM CLOSE

VALUE: 01.00 in

"ENTER" TO CONFIRM

6

CONFIRM ENTRY.

PRESS THE "ENTER"

KEY.

OPEN ANALYSIS PT 2

1.PERCENTAGE OF STROKE

2.DISTANCE FROM CLOSE

3.CONTACT +/- TIME

7

SELECT DISTANCE FROM CLOSE.

PRESS # 2 KEY.

OPEN ANALYSIS PT 2

DISTANCE FROM CLOSE

VALUE: XX.XX in

"ENTER" TO CONFIRM

8

ENTER 2 INCHES.

PRESS KEYS 0-9 TO

SET 2.00 INCHES.

OPEN ANALYSIS PT 2

DISTANCE FROM CLOSE

VALUE: 02.00 in

"ENTER" TO CONFIRM

9

RETURN TO MAIN MENU.

PRESS THE "ENTER"

KEY.

1.RUN TEST 06/10/07

2.GET RESULTS 20:10:01

3.SETUP

4.DIAGNOSTIC