JLG X14JH Operator Manual User Manual

Page 72

Advertising
background image

69

4.2.1 PERIODICAL MAINTENANCE TIMES

H

ONDA PETROL ENGINE

* First intervention.

BOOM LIFT MODELS X14JH

JLG

X14JHR0220311

DETAIL

INTERVEN‑

TION

BEFORE

STAR‑
TING.

SECOND

NEED

INTERVAL (HOURS)

PAGE

10

50

100

250

500 1000 2000

AIR FILTER

CLEANING
CONTROL

REPLACEMENT

ENGINE OIL

LEVEL CON‑
TROL

REPLACEMENT

•*

ENGINE SUMP

CLEANING

FUEL TANK
AND NET

CLEANING

HYDRAULIC
OIL

LEVEL CON‑
TROL

REPLACEMENT

HYDR. OIL
FILTER

CARTRIDGE
REPLACEMENT

•*

ARTICULATION
POINTS

GREASING

•*

BATTERY

ELECTROLYTE
LEVEL CON‑
TROL

REDUCTION
GEAR DRIVES
OIL

LEVEL CON‑
TROL

REPLACEMENT

•*

MACHINE

GENERAL
PERIODIC CON‑
TROL

•*

EXTENSION SLI‑
DING INNER
RING

WEAR CON‑
TROL

REPLACEMENT

Advertising