Variable frequency controller (vfc), Motor control box – and ist pump, Interface schematic to ts-lld - 13 – Franklin Fueling Systems TS-LLD Installation Manual User Manual

Page 47: Control unit installation page 2.3 - 13

Advertising
background image

Control Unit Installation

Page 2.3 - 13

2.3

Figure 2.3-12 Three Phase 240 VAC Supply – FE PETRO Variable Frequency Controller,

Motor Control Box – and IST Pump

Interface Schematic to TS-LLD

Reference Site Layout

Figure 2.2 - 16

Install Line Filter Cap at L1 and L2

DANGER ELECTRICAL SHOCK HAZARDS. TURN OFF AND LOCK-OUT THE SUBMERSIBLE PUMP POWER SOURCE (L1, L2, L3 - AT THE CIRCUIT BREAKER) - BEFORE - WORKING ON THIS EQUIPMENT. FAILURE TO TURN OFF THE THREE PHASE POWER SOURCE WILL RESULT IN SEVERE INJURY OR DEATH.

Conduit to pump Junction Box

FE PETRO IST three phase

pump motor

Overloads (OLs)

are in series w/ M1 & M3 )

Red

ORG

BLK

Variable Frequency Controller (VFC)

HOOK

(Dispense

Signal)

M3

M2

M1

L3

L2

L1

TS-LLD LSU (Leak Sensing Unit) at IST Pump Housing Leak Detection Port

BLK

Dispense Switches

GND

N

N

GND

GND

N

L3 is optional Three Phase wiring

L3

L2

L1

Electrical Power Panel

P/N

020-0028

S1

S2

M2

NL

2

M1

L1

Aux. Control Relay Box (remove dashed wires)

2 NEU

Neutral (WHT)

1) Observe color code L1 L2 L3 phase sequence for proper rotation of motor.

2) All conduit fittings, EYS seal fittings, and junction boxes in manholes or other Hazardous areas are to be explosionproof rated for: Class 1, Div 1, Group D and wet locations

INCON TS-LLD & FE PETRO IST (or STPs with VS2 suffix) Three Phase or Single Phase Wiring Diagram

NOTES

GND

RLY COIL (RED)

S2 (BRN) Pump On Sig. See Note 5

TB1

SIG RTN

3 P-OUT

4 P-IN

TS-LLD Control Unit (CU)

Power Source = L1

No connection. Wire is routed through the donut-shaped Pickup Coil

Pickup Coil

L1 Line (BLK)

RLY N.O. (ORG)

M1 (ORG)

2 485B

4 DSY2

F1

5 ALARM

3 DSY1

1 110V

TB2

1 485A

GND

Advertising