After maintenance or service do – - 2, Lsu bottom & side views - 2 – Franklin Fueling Systems TS-LLD Installation Manual User Manual

Page 68

Advertising
background image

5

Page 5 - 2

TS-LLD INSTALLATION GUIDE

Leak Sensing Unit (LSU) Adapters & Replacement Parts

Items

Frequency = A/R

Replacement Part Numbers

a) M I Cable Adapter 2 inch NPT ......................................... P/N = TS-RJ
b) M I Cable Adapter 3 inch Straight Thread ....................... P/N = TS-FE

c) Leak Sensing Unit

U

S

A ..................................................

P/N = TS-LSU

d) Leak Sensing Unit

Canadian........................................... P/N = TS-LSU/C

e) Leak Sensing Unit

Screen ..................................................

P/N = 270-0002

f) Leak Sensing Unit

O-Ring .................................................. P/N = 250-0048

LSU Removal for Service / Inspection and Cleaning

The LSU is removed or replaced whenever the following service steps are done.

Review Chapters 2.0 through 2.2 before removing or replacing a LSU.

1) With all pump power off and line-pressure relieved: follow the installation steps

& diagrams shown in Chapter 2.2

in reverse order

to remove the LSU.

2) Carefully straighten the MI Cable enough to provide clearance from other

components while the LSU is being unscrewed (removed) from the pump.

3) Clean the LSU

Screen

and Flow Tube

......when a

flashing 85 Error Code is displayed at the CU –

replace the

Screen

as required

4) Inspect LSU O-Ring

......when the LSU screen is

cleaned

– replace

O-Ring as required

. The LSU

O-Rings are made from a special material that are

UL rated – use no substitutes.

Install only genuine

INCON LSU

O-Rings. (Also see Appendix A about

Applicable Liquid Products.)

5) Reinstall / Install the Leak Sensing Unit per steps

shown in Chapter 2.2

6) Inspect the M I Cable at the LSU for damage, kinks, sharp bends, and breaks

before reapplying power

......whenever the containment sump has been

accessed ......and

after all maintenance or service of the Submerged Turbine

Pump or other related components (such as the piping system).

7) Replace the LSU per Chapter 2.2 –

before power-up

......whenever the MI Cable

has been damaged, or when the LSU has malfunctioned / become inoperable.

After Maintenance or Service DO –

Make sure that the system is operating properly ! See Chapters 2.4 and 3 for

information about System Operation and Testing, and Chapters 6.1 & 6.2 for

about Error Codes & Troubleshooting.

— ❖ —

LSU O-Ring

LSU Screen

LSU Leak Sensing

Flow Tube

(outlet at bottom)

Bottom & Side Views

Advertising