Franklin Fueling Systems TS-LLD Installation Manual User Manual
Page 5
Table of Contents
Chapter
.
Section
Page No.
3 TS-LLD System Operation & Testing (continued... )
Starting a 0.1 gph Annual Precision Leak Test ................................................ 3 - 4
Normal Operation – Sequence of Events / Steps ............................................... 3 - 5
( dispense: nozzle out / lever up / switch on ) ............................................. 3 - 5
( dispense: nozzle in / lever down / switch off ) ........................................... 3 - 5
A 0.2 gph Test Automatically Starts When:................................................... 3 - 6
Out of Compliance ............................................................................................ 3 - 6
Frequently Asked Questions:
Why do Error Codes 29, 30, 31, or 32 Appear ? ........................................... 3 - 7
How do I Display the Last Alarm or Error Code ?.......................................... 3 - 7
How do I Reset Flashing Error Codes ? ...How do I Allow Dispensing ?
How Often Should the Manual Test be Run ? ............................................... 3 - 8
When a 3 gph Leak Test Fails / Gross Leak is Detected ? ............................ 3 - 8
When a 0.2 gph Leak Test Fails / Leak is Detected ? ................................... 3 - 8
When a 0.1 gph Annual Precision Leak Test Fails / Leak is Detected ? ....... 3 - 8
4 TS-LLD Line Leak Detection .............................................................. 4 - 1