Mounting, installation, adjustment

Create

d

by EBCCW

0

0

:06

Page 29 of 68

5478EN-3

5.2

Assembly

This paragraph describes a number of operations for Spiral Elevators that
are not delivered fully assembled. After having finished mounting the Spiral
Elevator, the Spiral Elevator can be integrated (Section 1.4) in a system.

5.2.1

Motor

The gear motor may be delivered separately with the Spiral Elevator and
then has to be mounted on site.
First check if all the required parts are present:

Gear motor

Grease

Torque arm

Key for shaft

Fasteners (screw and washer)

The key and torque arm fastening to the frame may be pre-assembled.

The required tools are:

Procedure:

Determine the installation orientation of the gear motor.

Apply installation grease on the shaft to slide the gear motor onto
the shaft easier and prevent any fretting corrosion.

Attach the torque arm to the gear motor with the appropriate
fixings.

Place the locking ring (circlip) in the gear motor or move to the
desired groove in gear motor (if not already in the correct
position).

Open-end spanner

Ring spanner

Internal spring pliers