Commissioning – Lenze E82ZAFIC010 User Manual

Page 28

Advertising
background image

Commissioning

Commissioning steps

6

l

28

EDS82ZAFIC EN 2.0

Detailed
information

Procedure

Step

11.

Enable process output data with C1512 = 255.
Only required when C1511 has been changed.

12.

Enable the standard device via terminal 28 (CINH).

l

Set terminal 28 to HIGH level.

13.

Select setpoint.

l

The master transmits the setpoint via the selected process output data
word.

14.

Change to the READY TO START state:

l

The master transmits the DRIVECOM control word:
0000 0000 0111 1110

bin

(007E

hex

).

INTERBUS
communication
manual

^ 42

15.

The standard device is in the READY TO START state.

l

The master receives the DRIVECOM status word:
xxxx xxxx x01x 0001

bin.

16.

Change to the OPERATION ENABLED state.

l

The master transmits the DRIVECOM control word:
0000 0000 0111 1111

bin

(007F

hex

).

17.

The drive starts up.

Advertising
This manual is related to the following products: