Fusing a fitting, Notice, Equipment setup & usage instructions – Watts TRCU-M1 User Manual

Page 15: Prepare pipe for fusion, Step 1

Advertising
background image

13

Fusing a Fitting

• Always read and follow instructions and

warnings and do not use this equipment

unless you know how to operate it cor-

rectly .

• Follow and comply with all applicable

building codes, requirements, and stan-

dards .

• Always properly prepare pipe surfaces for

fusion .

• Corrosive chemicals and materials includ-

ing contamination in water can prevent

proper fusion .

• Have water tested by a professional

before performing work . Consult the

Plastic Pipe Institute for list of chemicals

that adversely affect plastic pipe .

(www .plasticpipe .org)

• Make sure pipe is free of debris and con-

taminants .

• Water inside of pipe can prevent proper

fusion . Make sure that pipe is free of

water before performing work .

• Always use new, undamaged TRITON

Fittings and Fusers that are the correct

size for the pipe you are fusing .

• Make sure that Fitting is in place and the

Fuser is properly positioned before initiat-

ing fusion .

• Always complete a full fusion cycle – do

not stop prematurely .

NOTICE

Failure to use this equipment as

instructed can result in substan-

dard pipe fusion which may fail

immediately or over time and could

cause leaking, flooding, or sub-

stantial property damage.

Equipment Setup & Usage Instructions

Prepare Pipe for Fusion

• Cut pipe cleanly and squarely using a

quality pipe cutter designed for the pipe .

• Gently wipe end of pipe with clean, dry

work towel to remove any oils or fluids .

• Remove any burrs or flash.

NOTICE

Do not use abrasive cloth or emery

paper on pipe to clean.

STEP 1

Advertising