Model 5600se downflow, Control start-up procedures (cont’d.), Fast cycle regeneration – Watts Fleck 5600 Plastic Valve User Manual

Page 8

Advertising
background image

Model 5600SE Downflow

8

Control Start-Up Procedures (Cont’d.)

5. Push the Extra Regeneration button.

6. Set Regeneration Day Override. Use the Set Up or Set Down buttons to set the maximum number of days before a

regeneration cycle must occur.

7. Push the Extra Regeneration button to exit the program.*

*Fast Cycle Regeneration

Perform the following Fast Cycle Regeneration if setting up the system for the first time:

1. Push the Extra Regeneration button for 5 seconds to force an extra regeneration immediately.

2. Once the valve reaches Regeneration, step 1, let water run to drain for approximately 5 minutes.

3. Push the Extra Regeneration button once to advance valve to Regeneration, step 2.

4. Push the Extra Regeneration button once to advance valve to Regeneration, step 3 (if active).

5. Push the Extra Regeneration button once to advance valve to Regeneration, step 4 (if active).

6. Push the Extra Regeneration button once to advance valve to Regeneration, step 5 (if active)

7. Push the Extra Regeneration button once more to advance the valve back to In Service.

Figure 6: Regeneration Day Override

Regeneration every
7 days minimum

Advertising
This manual is related to the following products: