Control Start-Up Procedures (Cont’d.)

Final Setup

With proper valve operation verified:

1. Add water to the top of the air check. Manually step the valve to the Brine Draw position and allow the valve to draw

water from the brine tank until it stops.

NOTE: The air check will check at approximately the midpoint of the screened intake area.

2. Manually step the valve to the Brine Refill position and allow the valve to return to the In Service position automatically.

3. With the valve in the Service position, check that there is approximately 1" (25 mm) of water above the grid in the brine

tank, if used.

4. Fill the brine tank with salt.

5. Setup is complete, the control can now run automatically.