Gasboy CFN Series SCII Start-Up Manual User Manual

Page 113

Advertising
background image

3

6.

SYSTEM ENVIRONMENT

Site Controller/Islander:

inside office, air-conditioned

_______________________________________________

Console:

inside office, air-conditioned

___________________________________________________________

PCU(s):

back room off of office

________________________________________________________________

ICR(s):

on island

_____________________________________________________________________________

Profit Point(s):

N/A

____________________________________________________________________________

FPR's:

N/A

__________________________________________________________________________________

7.

CONDUIT

All Metal Conduit? Y / N

AC and DC in Separate Conduit? Y / N

Wiring Neatness: Good/Fair/Bad

Is shielded cable (as specified in the Installation Manual) used? Y / N

If you answered NO to the above questions, contact GASBOY before proceeding.

8.

SYSTEM POWER

Power Conditioner:

Hot to Neutral __

120

_ VAC Hot to Ground _

120

VAC Neutral to Ground __

0

__ VAC

AC Surge Protector:

Hot to Neutral __

N/A _

VAC Hot to Ground _

N/A

VAC Neutral to Ground _

N/A

VAC

Islander:

Hot to Neutral __

N/A_

_ VAC Hot to Ground _

N/A

VAC Neutral to Ground __

N/A

VAC

PCU'(s):

Hot to Neutral __

120

_ VAC Hot to Ground _

120

VAC Neutral to Ground __

0

__ VAC

ICR'(s):

Hot to Neutral __

120

_ VAC Hot to Ground _

120

VAC Neutral to Ground __

0

__ VAC

FPR'(s):

Hot to Neutral __

N/A_

_ VAC Hot to Ground __-__ VAC Neutral to Ground ___-__ VAC

Grounding method:

neutral and ground bus bars bonded to ground rod

9.

DC POWER

Site Controller/Islander: +5 VDC __

5.01

__ +12 VDC __

11.99

__ -12 VDC _

-11.95

__

PCU'(s): +5 VDC _

5.00

__ +12 VDC _

11.98

____

ICR'(s): +5 VDC __

5.01

__ +12 VDC _

11.99

____

Current Loop Interface: +5 VDC _______ + 12VDC _______ -12 VDC _______
Consoles: +5 VDC __

5.00

___ + 12VDC _

12.05

___ -12 VDC _

12.00

___ +9 VDC _

9.00

_____

FPR'(s): +5 VDC _______

10. SYSTEM APPROVALS

Customer Comments: __________________________________________________________________________

____________________________________________________________________________________________
____________________________________________________________________________________________

Site Manager: _

Dave Christopher

____ Date:

9-5-98

I am satisfied with the installation of the GASBOY
CFN System and have been trained in its use and
operation.

Start-up Tech: __

Arthur Ized Repp

_ Date:

9-5-98

11. CUSTOMER KNOWLEDGE

has good understanding

__________________________________

Time Spent on Training:

4 hours

Names of People Trained:

Dave Christopher, Christine Tabby

Were test cards locked out? Y / N

Who were test cards left with?

Dave Christopher

Was backup copy made of system and any configuration changes? Y / N

Remarks:

(Use additional sheets if necessary)

____________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

Advertising
This manual is related to the following products: