Gasboy CFN Series SCII Start-Up Manual User Manual
Page 113
![background image](/files/787405/content/doc113.png)
3
6.
SYSTEM ENVIRONMENT
Site Controller/Islander:
inside office, air-conditioned
_______________________________________________
Console:
inside office, air-conditioned
___________________________________________________________
PCU(s):
back room off of office
________________________________________________________________
ICR(s):
on island
_____________________________________________________________________________
Profit Point(s):
N/A
____________________________________________________________________________
FPR's:
N/A
__________________________________________________________________________________
7.
CONDUIT
All Metal Conduit? Y / N
AC and DC in Separate Conduit? Y / N
Wiring Neatness: Good/Fair/Bad
Is shielded cable (as specified in the Installation Manual) used? Y / N
If you answered NO to the above questions, contact GASBOY before proceeding.
8.
SYSTEM POWER
Power Conditioner:
Hot to Neutral __
120
_ VAC Hot to Ground _
120
VAC Neutral to Ground __
0
__ VAC
AC Surge Protector:
Hot to Neutral __
N/A _
VAC Hot to Ground _
N/A
VAC Neutral to Ground _
N/A
VAC
Islander:
Hot to Neutral __
N/A_
_ VAC Hot to Ground _
N/A
VAC Neutral to Ground __
N/A
VAC
PCU'(s):
Hot to Neutral __
120
_ VAC Hot to Ground _
120
VAC Neutral to Ground __
0
__ VAC
ICR'(s):
Hot to Neutral __
120
_ VAC Hot to Ground _
120
VAC Neutral to Ground __
0
__ VAC
FPR'(s):
Hot to Neutral __
N/A_
_ VAC Hot to Ground __-__ VAC Neutral to Ground ___-__ VAC
Grounding method:
neutral and ground bus bars bonded to ground rod
9.
DC POWER
Site Controller/Islander: +5 VDC __
5.01
__ +12 VDC __
11.99
__ -12 VDC _
-11.95
__
PCU'(s): +5 VDC _
5.00
__ +12 VDC _
11.98
____
ICR'(s): +5 VDC __
5.01
__ +12 VDC _
11.99
____
Current Loop Interface: +5 VDC _______ + 12VDC _______ -12 VDC _______
Consoles: +5 VDC __
5.00
___ + 12VDC _
12.05
___ -12 VDC _
12.00
___ +9 VDC _
9.00
_____
FPR'(s): +5 VDC _______
10. SYSTEM APPROVALS
Customer Comments: __________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
Site Manager: _
Dave Christopher
____ Date:
9-5-98
I am satisfied with the installation of the GASBOY
CFN System and have been trained in its use and
operation.
Start-up Tech: __
Arthur Ized Repp
_ Date:
9-5-98
11. CUSTOMER KNOWLEDGE
has good understanding
__________________________________
Time Spent on Training:
4 hours
Names of People Trained:
Dave Christopher, Christine Tabby
Were test cards locked out? Y / N
Who were test cards left with?
Dave Christopher
Was backup copy made of system and any configuration changes? Y / N
Remarks:
(Use additional sheets if necessary)
____________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
- 216S
- Atlas Fuel Systems Site Prep Manual
- Atlas Technician Programming Quick Ref
- ATC M05819K00X Kits
- Atlas Fuel Systems Owner Manual
- Gilbarco Global Pumping Unit Operation Manual
- 26
- 26
- 620 Series
- 26
- 26
- Atlas Valve Replacement Kits
- Atlas Fuel Systems Installation Manual
- 9820K
- 9120K
- Atlas Single Std. Inlet Centering Kit
- 8800 Atlas
- 9120K Series Service Manual
- 9800A Atlas
- 9800 Atlas
- 9800 Atlas
- M08400
- 9100 Series
- 9820K Series Installation
- 9853K
- 9216KTW
- Recommended Spare Atlas
- DEF Atlas
- 9820K Series
- 9800Q
- Q Series
- 8753E
- 9152AXTW2
- 8800E
- 8800E
- 9820Q Series
- Atlas Start-up
- 215A
- 9800A
- 9820A
- 2600A
- 2600A
- 2600A
- 9800Q Front Load Vapor
- 9800Q Front Load Vapor
- 9800Q Vapor
- 9800Q Vapor
- 216A
- 215A
- Lamp Kit
- 9120Q Pulser
- 9120Q Series
- 9820Q
- Electric Keytrol
- 9700E
- 9100A
- 5300A
- 553A Series
- Atlas Retail Series
- 9820Q ASTRA
- 9820Q ASTRA
- 9100Q Series
- 2600A High Hose Retriever Kit
- 9820A
- 2600A High Hose Retriever Kit
- 2600A High Hose Retriever Kit
- 2600A High Hose Retriever Kit
- 9800A Series
- 9800A Series
- 8700Q Series
- XU2A
- Q
- 580 Pulser
- 9800Q Series Diagnostic Manual
- 9800Q Series
- 7520 Pulser
- 2620
- 9820
- Blackmer GDP
- Vapor Recovery Kit
- 9800A Totalizer Kit
- 9800 Single
- RS-485 Interface Kit
- 240VAC Heater Kit
- 9800 Rear Totalizer Kit
- 240VAC Fluorescent Light Kit
- EQ 25 XXX
- M04230K00X
- Kit M04477K001
- Totalizer Retro
- M06245K0XX
- Atlas Discharge
- 9800K
- 9800K
- Cold Weather External Filter Upgrade Kit
- Hi-Flow Sat Pipng Conversion Kits
- NPT Disch Kit
- External Filter
- M06430K00X
- M06699KXXX
- Atlas Rain Baffle Air Gap Kit
- Battery Heater Kits
- Hand Drive Kit
- Ultra-Hi Mech Totalizer Kit
- M06875K00X
- Submersible Drv Relay Kit
- 9820K Totalizer Kit
- 9823K Vapor Rcvry Kit
- 9X20 AST Adapter Kit
- 03908X
- 52 Pressure Regulator Valve
- M12158A004
- 900 Series
- M14142K001
- M06184K00X
- Cenex
- Gilbarco Interface Unit
- M09677B015
- FiPay Server Retrofit Kit for 8-hose Islander
- 1000 Series FleetKey FMS Operation Manual
- 1000 Series FleetKey FMS Operation Manual
- 1000 Series FMS Cardless Manual
- 1000 Series FleetKey FMS Operation Manual
- 1000 Series FleetKey FMS Operation Manual
- 1000 Series FleetKey FMS Operation Manual
- CFN Site Controller
- CFN Series CFN II Quick Reference
- Hard Drive
- Star Printer Controller PCB
- SCII CPU PCB
- CFN Series SCII Installation Manual
- ICR Power Supply Replacement
- Islander Internal Modem
- Islander 4-Hose PCU
- Islander 4-Hose PCU
- ME-800 SHM
- Verifone PIN Pad
- C05899
- C05899
- SCII
- CFN Islander II
- CFN Islander II
- RPS Card Handler
- Gascard Credit
- EDS-CCIS Credit
- Wayne CAT Interface
- Sinclair Credit
- Unitec Interface
- PIN Pad-CFN III
- CFN RPS Card Handler
- MasterCard Fleet Card Handler
- Datacard
- Dial 001
- Attendant Card Handler 2003
- Card Limit Card Handler
- SCIII POS
- Shell Go Card Handler
- ICR Display
- Profit Point
- Profit Point
- Cabling
- Islander II Floppy Drive
- CFN Islander II w/Key
- Profit Point Power Supply
- SCIII Board Set
- Islander Card Reader Retrofit
- CFN Series Profit Point PLUS
- FleetCor Dual Special Card Handler
- CFN Series Site Controller III
- CFN Series CFN III Configuration Manual V3.6
- CFN Series CFN III Configuration Manual V3.6
- CFN III Configuration Manual
- CFN Series CFN III Configuration Manual V3.6
- CFN Series Diagnostic Manual
- CFN Series Gilbarco CRIND PC Interface for Site Controller III
- DLL2020 Scanner
- CFN III Mgnr's Mnl V3.4
- CFN III Mgnr's Mnl V3.4
- GL3 V1.4.0.0 and Late
- GL3 V1.4.0.0 and Late
- Voyager Special Card Handler
- CFN III Quick Reference Guide v3.4
- CFN III Quick Reference Guide v3.4
- Site Controller III Start-Up
- Site Controller II CPU
- WEX Special Card Handler
- ADDS 4000
- Dorio 10
- MS7120 Bar Code Scanner Setup
- CFN Series Tokheim Pump PC Interface
- Buypass
- EFS Trking Fuel Mgmnt
- CFN Series Gilbarco Pump PC Interface
- PIN Calculator
- CFN Series Unitec PC Interface
- Quarles NBS
- Current Loop Driver Ferrite
- CFN III Payment Application Best Practices Implementation Requirements
- PA03660XXX
- CFN III V3.6 and Later
- CFN III Fuel Management System PA-DSS
- CFN Series Site Controller III Start-up Manual V3.6
- CFN Series Site Controller III Start-up Manual V3.6
- CFN III Cancel Transaction Decal
- Islander II Spare Parts Kit
- CFN III Manager Manual V3.6
- CFN III Manager Manual V3.6
- Fuel Point
- Putprice command default
- 600 Series Nozzle Boot
- 2020
- VT 520
- 4860 Series Meter
- 1800 Series
- CFN Islander
- 26 Series
- 580
- M08781K001
- 1800 Series Installation
- 580 Series
- 1000 Series FMS Startup Manual
- 1000 Series FMS Card Encoding Manual
- 1000 Series Technical Reference Manual
- 1000 Series Installation
- 1000 Series to FleetKey Conversion Manual
- 1000 Series Field Installation Internal Modem
- 1000 Series Field Installation Internal Modem
- 1000 Series Installing System ROM Chip
- 1000 Series Shift Register Selections
- 1000 Series FMS Diagnostic Manual
- 1000 Series TopKAT Report Printer
- 1000 Series Fuel Management System Installation
- TopKAT Operation Manual
- TopKAT on Pedestal Installation
- TopKAT on Pedestal Installation
- TopKAT Online Operation Manual
- TopKAT PLUS Bypass Switch Installation
- MCE300
- 4-Hose PCU
- MCE300 Program Instructions
- CFN Series
- Magnetic Card Encoder
- Fuel Point-Swivel Limit Bracket
- Swivel Limit
- Fuel Point Dispenser
- Fuel Point-Special Hose
- Fuel Point Reader
- Fuel Point Vehicle Module
- Fuel Point Ground Antenna
- FMS KE200
- Enhanced Communications
- WGT Outdoor Unit
- Tag Reader
- Fuel Truck Controller
- CFN Plus
- FuelOmat Payment Terminal
- SiteOmat Users Manual
- ICR PLUS
- Fuel Point PLUS Station
- SiteOmat Maintenance Manual
- SiteOmat Data Downloader
- FuelOmat system 8 Popt Commverter
- FiPay Payment Network
- Fuel Point PLUS Vehicle
- TopKAT PLUS
- FHO Pods
- Fleet Head Office System
- Fleet PLUS
- Fleet PLUS Rev C
- 1820RCSS