Gasboy CFN Series SCII Start-Up Manual User Manual

Page 55

Advertising
background image

Jumpers & Switch Settings

03/07/03

5-17

A C07263 cable is also needed on the Site Communication I/O board from P10 connector to
pins 6 through 10 of P3 (for port1) or P4 (for port 3). This cable is installed in the head of the
Islander at the factory.

Cabling and Port Jumper Configuration for Wayne Pumps

The SC II CPU K1 (port1) or K2 (port 3) jumper patch must be configured as
follows to communicate with the Wayne pumps.

The jumpers on the Site Communication I/O board in the head of the Islander (on the inside of the
left partition) for port 1 or port 3 must be configured as shown below:

Advertising
This manual is related to the following products: