9 | schematics – Lencore Spectra i.Net: Installation and Operations Manual User Manual

Page 28

Advertising
background image

section 5

5.9 | schematics

Connect each power supply and i.Lon Central Control Server and MPI to a dedicated 20
amp receptacle. Each dedicated circuit must be a 120V/20 amp.

Once each item is connected, you may visually observe in the power supply a lit green
LED, and sequencing of lights on the i.Lon® server and MPI.

The i.Lon® needs approximately two minutes to completely boot up.

You will not hear any sound for approximately 30 seconds. The OPs count down from 20

to 0 before booting up. (This permits new software/firmware uploads and tracking of

any corrupt data.)

TO POWER THE SYSTEM:

ONCE THE SYSTEM IS PLUGGED IN:

2

1

24

Advertising