6 commissioning, 1 before initial switch-on, Commissioning – Lenze E84AYCEC User Manual
Page 37: Before initial switch-on
Advertising
EDS84AYCEC EN 3.0 - 09/2012
L
37
E84AYCEC communication manual (Ethernet POWERLINK)
Commissioning
Before initial switch-on
6
Commissioning
During commissioning, system-related data such as motor parameters, operating
parameters, responses, and parameters for fieldbus communication are defined in the
controller. For Lenze devices, this is done by means of codes.
The codes of the controller and of the communication are stored as a non-volatile data set
in the memory module.
In addition, other codes are available for diagnosing and monitoring the nodes.
6.1
Before initial switch-on
Stop!
Before switching on the Inverter Drive 8400 and the communication module for
the first time, check the entire wiring for completeness, short circuit and earth
fault.