6 commissioning, 1 before initial switch-on, Commissioning – Lenze E84AYCEC User Manual

Page 37: Before initial switch-on

Advertising
background image

EDS84AYCEC EN 3.0 - 09/2012

L

37

E84AYCEC communication manual (Ethernet POWERLINK)

Commissioning

Before initial switch-on

6

Commissioning

During commissioning, system-related data such as motor parameters, operating

parameters, responses, and parameters for fieldbus communication are defined in the

controller. For Lenze devices, this is done by means of codes.
The codes of the controller and of the communication are stored as a non-volatile data set

in the memory module.
In addition, other codes are available for diagnosing and monitoring the nodes.

Parameter reference

( 66)

6.1

Before initial switch-on

Stop!

Before switching on the Inverter Drive 8400 and the communication module for

the first time, check the entire wiring for completeness, short circuit and earth

fault.