LumaSense Technologies INNOVA 1316A-2 User Manual

Page 59

Advertising
background image

Chapter 4
_________________________________________________________________________________________

_____________________________________________________________________________

BE6021-11

1316A-2 Multi Gas Monitor

LumaSense Technologies A/S

Instruction Manual

Page 59 of 97

Figure 4.4. The Status Window displaying the Pump Out Flow Check.

The Multi Gas Monitor – INNOVA 1316A-2 is purged with sample gas

by pumping room air from the zero inlet on the rear panel through the

entire flow system..

During the zero calibration purge period, the O

2

sensor’s electrical

zero offset is calculated and stored. The optimum gain is calculated

for each IR channel.
The new calibration constants:
CO

2

, Freon and NO zero calibration constants.

O

2

span calibration constant.

Are calculated and stored in flash memory:
When the zero calibration process is successful, the following actions

are performed:
The red Zero Required in the Status screen, see

figure 4.3

, is

changed to show a green Not Required, see

figure 4.5

.

The Proc In Progress in

figure 4.3

is changed from a red In

Progress to a green Not in Progress in the status screen, see

figure

4.5

.

Advertising