T40 installation and assembly – Delfield T5 User Manual

Page 41

Advertising
background image

41

8. Thread electrical from the inside of the unit through the
supplied hole in the top. Do not cut another hole to thread
electrical.

9. Thread electrical wires through the top of control box and
connect to controls.
• Attach labeled electrical line to the corresponding labeled

connector on the control panel.

10. Pipe remote condensing unit to the refrigerant lines
coming out of the top of the cabinet.
This should be done by a qualified refrigeration expert.

Put the compressor system in a suitable, well aired place no
farther than 25 feet. from cabinet.

11. Place interior probes

1. Interior Probe1: Place on wall next to the evaporator

2. Food Probe: Place in food product for monitoring

3. Interior Probe2: Place on opposite side of cabinet

from evaporator 3/4 of the way to the top of the

cabinet.

12. Unit must be plumbed with a P-trap to a drain for
evaporator water discharge.

13. Place cam plugs in all cam holes to cover them. Press until
seated in holes.

14. Install ramp and threshold onto the front of the outside of
the door.

T40 Installation and Assembly

Advertising
This manual is related to the following products: