Leveling the planter, Toolbar height adjustment, Leveling the planter -6 – Kinze 3110 Mounted Planter Rev. 7/14 User Manual

Page 18: Toolbar height adjustment -6

Advertising
background image

M0244-01

Model 3110

2-6 9/12

TM

Machine Operation

LEVELING THE PLANTER

1. Drive the tractor and planter on level ground.

2. Lower the planter to the ground.

3. Check to be sure toolbar height is 20"-22". See “Toolbar

Height Adjustment”.

4. Check to be sure planter is level front-to-rear and row

unit parallel arms are level. Adjust upper link on tractor
accordingly.

20"-22"

Toolbar

Level
Planting
Surface

Upper Link

Shown with Customer-Supplied quick Hitch

TOOLBAR HEIGHT ADJUSTMENT

The drive wheel assembly is designed so the wheel can be adjusted to maintain a toolbar height of 20"-22" from the

planting surface in all planting situations. This is particularly useful when the planter is used for ridge planting or planting

on beds. The drive wheel assembly has an adjustment range of 7".

To adjust toolbar height:

1. Loosen the jam nut using a 1½" wrench or a 15" adjustable wrench.

2. Turn the adjusting nut using a 1⅞" wrench or 15" adjustable wrench (clockwise to decrease frame height or counter

clockwise to increase frame height).

3. Tighten the jam nut.

Standard Rear Mounted Drive wheel

Optional Front Mounted Drive wheel

Advertising