Leveling the planter, Toolbar height adjustment, Leveling the planter -6 – Kinze 3110 Mounted Planter Rev. 7/14 User Manual
Page 18: Toolbar height adjustment -6
M0244-01
Model 3110
2-6 9/12
TM
Machine Operation
LEVELING THE PLANTER
1. Drive the tractor and planter on level ground.
2. Lower the planter to the ground.
3. Check to be sure toolbar height is 20"-22". See “Toolbar
Height Adjustment”.
4. Check to be sure planter is level front-to-rear and row
unit parallel arms are level. Adjust upper link on tractor
accordingly.
20"-22"
Toolbar
Level
Planting
Surface
Upper Link
Shown with Customer-Supplied quick Hitch
TOOLBAR HEIGHT ADJUSTMENT
The drive wheel assembly is designed so the wheel can be adjusted to maintain a toolbar height of 20"-22" from the
planting surface in all planting situations. This is particularly useful when the planter is used for ridge planting or planting
on beds. The drive wheel assembly has an adjustment range of 7".
To adjust toolbar height:
1. Loosen the jam nut using a 1½" wrench or a 15" adjustable wrench.
2. Turn the adjusting nut using a 1⅞" wrench or 15" adjustable wrench (clockwise to decrease frame height or counter
clockwise to increase frame height).
3. Tighten the jam nut.
Standard Rear Mounted Drive wheel
Optional Front Mounted Drive wheel