Demand recording promotes the ability of an electric power provider to plan for future upgrades. For
example, increasing load, over time, at a substation will be reflected in the demand values. This growing
demand can be addressed through additional capacity before the increasing load becomes an issue.

The BE1-11g continuously calculates demand values for current, watts, vars, and VA. Demand values are
recorded with timestamps for peak demands and present demands. Programmable alarm points can be
set to alarm if thresholds are exceeded for overload and unbalanced loading conditions. For information
on enabling alarms, refer to the

Alarms

chapter.

Current

Demand values are continuously calculated for phase currents (IA Circuit 1, IA Circuit 2, IB Circuit 1, IB
Circuit 2, IC Circuit 1, IC Circuit 2), neutral current (3I0 Circuit 1, 3I0 Circuit 2), negative-sequence current
(I2 Circuit 1, I2 Circuit 2), and ground current (IG Circuit 1, IG Circuit 2).

Demand Current Reporting Settings

BESTCOMSPlus Navigation Path: Settings Explorer, Alarm Configuration, Demands

HMI Navigation Path: Settings Explorer, Alarm Configuration, Demands

Settings are made using BESTCOMSPlus

®. Use the Settings Explorer to open the Alarm Configuration,

Demands tree branch. Demand settings for current thresholds include Phase, Neutral/Ground, and
Negative-Sequence. Enter the appropriate demand current reporting settings. Refer to Figure 154.

Figure 154. Demands Screen

Table 84 summarizes the demand current reporting settings.

Table 84. Demand Current Reporting Settings

Setting

Range

Increment

Unit of

Measure

Default

Phase Interval

0 or 1 to 60

0.5

minutes

15

Neutral/Ground Interval

0 or 1 to 60

0.5

minutes

15

Negative-Sequence Interval

0 or 1 to 60

0.5

minutes

15