Site preparation, Required materials – Polycom SpectraLink 1725-36028-001 User Manual

Page 19

Advertising
background image

3

Site Preparation

As shown in the system diagram in the previous section, the
SpectraLink 8000 Telephony Gateway is connected to both the
Ethernet switch and the wired telephone system; the SpectraLink 8000
SVP Server is connected to the Ethernet switch only. The
specifications covered here allow for great flexibility in physical
placement of the components within stated guidelines.
This unit must be installed by a service person familiar with the
installation of electronic equipment.
Do not power up the unit before it has been properly grounded to a
protective earth. See Chapter 6 Install SpectraLink 8000 Telephony
Gateway -
Grounding instructions.

Required Materials

The customer must provide the following equipment.

Power Outlet(s): Must accept Polycom provided AC adapter, one
for each SpectraLink 8000 Telephony Gateway and one for the
SpectraLink 8000 SVP Server (if required). For multiple
SpectraLink 8000 Telephony Gateway installations, provide
power strips with sufficient outlets and built-in power switches to
enable the Telephony Gateways to be powered on and off at the
same time.

Cross-Connect Block: Required to connect the PBX ports to the
SpectraLink 8000 Telephony Gateway(s).

25 Pair Cables: RJ-21 male at SpectraLink 8000 Telephony
Gateway end, required to connect each SpectraLink 8000
Telephony Gateway to the cross-connect blocks.

Backboard space: The SpectraLink 8000 Telephony Gateway
and the SpectraLink 8000 SVP Server are designed to be wall
mounted to 3/4” plywood securely screwed to the wall.

Screws: Required to mount the SpectraLink 8000 Telephony
Gateway and the SpectraLink 8000 SVP Server (if required) to the

PN: 1725-36028-001_T.doc

19

Advertising