Polycom SpectraLink 1725-36028-001 User Manual

Page 32

Advertising
background image

SpectraLink 8000 Telephony Gateway Administration Guide

Mount the SpectraLink 8000 Telephony Gateway
to rack

The Rack Mount Kit is designed for mounting equipment in a
standard 19-inch rack and should contain the following equipment:

Mounting plates: Two for each Gateway to be mounted.

Screws: Four rack mount screws for each Gateway to be mounted.

Follow these steps to mount the Gateway to a rack:
1. Remove the corner screws from the Gateway.
2. Screw the U-shaped end (round screw holes) of the two mounting

plates to the Gateway.

3. Screw the other end of the two mounting plates (oblong screw

holes) to the rack. Connector A should be to the right.

Mount the SpectraLink 8000 Telephony Gateway
to wall

Follow these steps to mount one SpectraLink 8000 Telephony
Gateway to a wall:
1. Using a 1/8” drill bit, drill four pilot holes, on 1.84” by 12.1”

centers (approximately equivalent to 1-13/16” by 12-1/8”).

2. If installing only one SpectraLink 8000 Telephony Gateway, insert

the #8 x 3/4” screws in the pilot holes and tighten, leaving a 1/8”
to 1/4” gap from the wall. Position the SpectraLink 8000
Telephony Gateway with Connector A to the right (horizontal) or
bottom (vertical).

3. Slide the SpectraLink 8000 Telephony Gateway over the screws

until the unit drops into place in the keyhole opening.

Grounding instructions



Safety

Warning

The metal chassis of this unit may contain leakage currents (i.e.,
"touch" current) which is cumulative when multiple units are
connected together to form a system. To prevent the summation of
leakage currents from being present on exposed metal surfaces, the
following installation procedure must be followed.

32

PN: 1725-36028-001_T.doc

Advertising