Polycom SpectraLink 1725-36028-001 User Manual

Page 20

Advertising
background image

SpectraLink 8000 Telephony Gateway Administration Guide

wall. Four #8 x 3/4” panhead wood screws (or similar device) are
required for each component.

10BaseT Cables: RJ-45 connector at each SpectraLink 8000
Telephony Gateway. Connection to Ethernet switch.

CAT 5 Cable: RJ-45 connector at the SpectraLink 8000 SVP
Server. Connection to Ethernet switch.

Modem Cable: DB-9 female, null-modem cable. Required for
initial setup of the SpectraLink 8000 Telephony Gateway and SVP
Server.

Outlet Strip: For installations with more than one SpectraLink
8000 Telephony Gateway, use an outlet strip with a built in power
switch to allow SpectraLink 8000 Telephony Gateways to be
turned on and off together.

Grounding materials per section below Grounding Instructions.

20

PN: 1725-36028-001_T.doc

Advertising