2 machine switch-on, 2 mac h ine s w itc h -on 1.2 machine switch-on – HEIDENHAIN iTNC 530 (606 42x-02) User Manual

Page 53

Advertising
background image

HEIDENHAIN iTNC 530

53

1

.2 Mac

h

ine S

w

itc

h

-On

1.2 Machine Switch-On

Acknowledge the power interruption and move
to the reference points

U

Switch on the power supply for control and machine. The TNC starts
the operating system. This process may take several minutes. Then
the TNC will display the message “Power interruption.”

U

Press the CE key: The TNC converts the PLC

program

U

Switch on the control voltage: The TNC checks

operation of the emergency stop circuit and goes into
the reference run mode

U

Cross the reference points manually in the displayed

sequence: For each axis press the machine START
button. If you have absolute linear and angle encoders
on your machine there is no need for a reference run

The TNC is now ready for operation in the Manual Operation mode.

Further information on this topic

„

Traversing the reference marks: See “Switch-on” on page 542

„

Operating modes: See “Programming and Editing” on page 79

Switch-on and crossing the reference points can vary
depending on the machine tool. Your machine manual
provides more detailed information.

Advertising