Electronics International MVP-50T User Manual
Page 16
2.0
2.0
2.0
2.0
2.0
Hardware Installation
Hardware Installation
Hardware Installation
Hardware Installation
Hardware Installation
2.1 Important Information and Initial Checkout:
2.2 Review the "EDC Wiring Work Sheets:"
2.3 Verify You Have all the Probes, Modules, Transducers and Cables:
2.4 Install the MVP Display:
2.5 Install the Temperature Probes:
2.6 Install the Pressure Transducers:
2.7 Install the Interface Circuit for Annunciators:
2.8 Install the Interface Circuit for Flap and Trim Pots:
2.9 Install the Interface Circuit for the Gear Position, Unsafe Indicator and Gear
Warning:
2.10 Install the CO Guardian CO Detector:
2.11 Install the Shunt:
2.12 Install the Fuel Flow Transducer:
2.13 Install the P-300C Fuel Level Probes:
2.14 Install the P-300M Magnetic Fuel Level Sender:
2.15 Install the Resistive Fuel Level Module (RFLM-4-X):
2.16 Install the Voice Alarm Control Panel:
2.17 Install the Intensity Control Pot (Optional):
2.18 Install the Master Warning (red) and Caution (yellow) Lights:
2.19 Installing the EDC-33T:
9