Electronics International MVP-50T User Manual

Page 16

Advertising
background image

2.0

2.0

2.0

2.0

2.0

Hardware Installation

Hardware Installation

Hardware Installation

Hardware Installation

Hardware Installation

2.1 Important Information and Initial Checkout:

2.2 Review the "EDC Wiring Work Sheets:"

2.3 Verify You Have all the Probes, Modules, Transducers and Cables:

2.4 Install the MVP Display:

2.5 Install the Temperature Probes:

2.6 Install the Pressure Transducers:

2.7 Install the Interface Circuit for Annunciators:

2.8 Install the Interface Circuit for Flap and Trim Pots:

2.9 Install the Interface Circuit for the Gear Position, Unsafe Indicator and Gear

Warning:

2.10 Install the CO Guardian CO Detector:

2.11 Install the Shunt:

2.12 Install the Fuel Flow Transducer:

2.13 Install the P-300C Fuel Level Probes:

2.14 Install the P-300M Magnetic Fuel Level Sender:

2.15 Install the Resistive Fuel Level Module (RFLM-4-X):

2.16 Install the Voice Alarm Control Panel:

2.17 Install the Intensity Control Pot (Optional):

2.18 Install the Master Warning (red) and Caution (yellow) Lights:

2.19 Installing the EDC-33T:

9

Advertising