Electronics International MVP-50T User Manual

Page 7

Advertising
background image

3.6 Connect the RFLM-4-x Harness to the EDC Connector and to the Resistive

Fuel Level Sensor ----------------------------------------------------------------------------- 27

3.7 Connect the EDC Harness to the Capacitive Fuel Level Probes ------------------- 27
3.8 Connect the EDC Harness to the P-300M Magnetic Fuel Level Senders --------- 28
3.9 Connect the EDC Harness (Volts Measurement Pin) to the Bus -------------------- 28
3.10 Connect the EDC Harness to the N1 and/or N2 Tach Generator ---------------- 28
3.11 Connect the EDC Harness to the VI-221's (Voltage Interface Units) ------------- 28
3.12 Connect the EDC Harness to Power and Ground ------------------------------------ 29
3.13 Route the EDC RS422 Wires to the MVP Connector -------------------------------- 29

4.0 Install the MVP Wire Harness and Route the Wires ------------------------------------ 31

4.1 Attach the MVP 25-pin D-Sub Connector to the MVP -------------------------------- 33
4.2 Connect the EDC RS422 Wires to the MVP RS422 Wires --------------------------- 33
4.3 Connect the MVP Harness to the Master Warning and Caution Lights ------------ 33
4.4 Connect the MVP Harness to the Voice Alarm Control Panel (AV-17CP) -------- 33
4.5 Connect the MVP Harness to the Audio Panel ------------------------------------------ 34
4.6 Connect the MVP Harness to the External Intensity Control Pot (CP-1) ---------- 34
4.7 Connect the MVP Harness to the Moving Map Data Out from the GPS ---------- 34
4.8 Connect the MVP Harness to the Fuel Data Input on the GPS --------------------- 34
4.9 Connect the MVP "Transmit Lockout Input" pin to the Transmit Key ------------ 35
4.10 Connect the MVP Harness to Power and Ground ------------------------------------ 35
4.11 Connect the MVP Harness to the CO-Guardian CO Detector -------------------- 35

5.0 Mandatory System Setup and Checkout ---------------------------------------------------- 37

5.1 Power-On Checkout: ------------------------------------------------------------------------ 39
5.2 Perform all Steps in the "MVP-50T Setup Checklist" -------------------------------- 39
5.3 Ground Run Checkout ----------------------------------------------------------------------- 39
5.4 First Flight Checkout ------------------------------------------------------------------------- 40
5.5 Read the "Warranty/Agreement" and the "Important Notice" ---------------------- 40

6.0 Installlation Data ----------------------------------------------------------------------------------- 41

6.1 Continued Airworthiness and Limitations -------------------------------------------------- 43
6.2 Airworthiness Limitations -------------------------------------------------------------------- 43
6.3 Working With Connectors -------------------------------------------------------------------- 43

6.31. Installing a Red Slip-on Connector onto a TC or Tin Copper Wire: ---------- 44
6.3.2 Installing a Yellow Precision TC Connector onto a TC Wire: ------------------ 45
6.3.3 Installing a D-sub Pin onto a TC or Tin Copper Wire: -------------------------- 45

MVP-50T 25-pin D-sub Connecot Wiring Diagram -------------------------------------

47

EDC Wiring Work Sheet, Top Connector -------------------------------------------------

48

EDC Wiring Work Sheet, Middle Connector ---------------------------------------------

49

EDC Wiring Work Sheet, Bottom Connector --------------------------------------------

50

MVP Aircraft Panel Cutout --------------------------------------------------------

51

EDC Template ----------------------------------------------------------------------

52

Contents

(Page 2 of 2)

Advertising