Electronics International MVP-50T User Manual

Page 30

Advertising
background image

When routing the EDC wire harnesses refer to the Top, Middle and Bottom "EDC Wiring Work Sheets" found
at the back of this manual. Insure no wires obstruct the freedom of travel of any controls.

3.1 Attach the three EDC 37-pin wire harnesses to the EDC:

Secure the connectors using the supplied mounting screws.

3.2 Connect the EDC Harness to the Temperature Probes:

Route each of the temperature cables in the EDC harness to the appropriate temperature probe. Cut the wires
to length, install the appropriate connectors (see the “Working with Connectors” section of this manual for
more information) and connect to the temperature probe. When connecting to a temperature probe, leave some
slack in the cable exiting the probe to prevent damage to the probe over time.

25

All Type K Temperature Probes

All E.I. Temperature
Probes are Type K.

(Red)

(Yel)

E

DC

Temp Input

(1 of 13)

Middle Connector

3.3 Connect the EDC Harness to the Pressure Transducers:

Route each of the pressure cables in the EDC harness to the appropriate pressure transducers. Cut the wires to
length, install the appropriate connectors (see the “Working with Connectors” section of this manual for more
information) and connect to the pressure transducer. When connecting to a pressure transducer, leave some
slack in the cable exiting the transducer to prevent future damage to the transducer.

PT-30GA, PT-100GA, PT300GA, PT-3000S

Pressure Transducers:

PT-30ABS, PT-60ABS, PT-05Diff, PT-04H20

Pressure Transducers:

(Red)
(Blk)

(Grn)

(Wht)

EDC

Press Input

(1 of 9)

(Red)
(Blk)

(Grn)

(Wht)

EDC

Press Input

(1 of 9)

Advertising